Watt Next
← Europe

Portugal

Doesn't pay off for mid-sized plants under this scenario

0 plants viable today
0 tCO₂/yr avoided
Sector
Plant size
Consumption band
Max process temp200 °C

Plants

EEA Industrial Reporting 2024 matched to EU ETS 2025 emissions

Pays off todayPays off with pipelineDoesn't pay off
Loading map…

Plant shortlist

Ratio vs EU investment threshold 2.0 · margin

  1. 1
    BIOTEK, S.A.
    Paper · Large · 110°C
    2.02 / 2.0
    -0.02
  2. 2
    Sidul Açúcares, Unipessoal Lda.
    Food · Large · 90°C
    2.02 / 2.0
    -0.02
  3. 3
    Fábrica de Papel da Lapa, Lda
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  4. 4
    Papeleira Coreboard, S.A.
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  5. 5
    Luso Finsa - Indústria e Comércio de Madeiras, S.A.
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  6. 6
    Sociedade Transformadora de Papeis Vouga, Lda
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  7. 7
    Prado-Cartolinas da Lousã, S.A.
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  8. 8
    Fábrica de Papel e Cartão da Zarrinha, S.A.
    Paper · Mid · 110°C
    2.22 / 2.0
    -0.22
  9. 9
    F.I.T. - Fomento da Indústria do Tomate, S.A.
    Food · Mid · 90°C
    2.22 / 2.0
    -0.22
  10. 10
    Sutol - Industrias Alimentares, Lda.
    Food · Mid · 90°C
    2.22 / 2.0
    -0.22
  11. 11
    SCC - Sociedade Central de Cervejas e Bebidas,S.A.
    Food · Mid · 90°C
    2.22 / 2.0
    -0.22

News & AI overview · Portugal

AI searches the web for news affecting prices, policies and carbon

Click “Fetch news” to have AI search the latest news for Portugal and explain how it and your current settings affect the numbers.

AI assessment

Generated from ratio data, NECP and policy pipeline

Portugal's real electricity-to-gas ratio for mid-sized plants is 2.22 and 2.02 for large plants (Eurostat, 2026-S1, excl. VAT), 0.22 above the breakeven of 2. Gas costs about 51 €/MWh and electricity about 114 €/MWh. Over the last six semesters the mid-sized ratio moved between 1.84 and 2.53. 11 matched sites, mostly paper; heat estimates come from 2025 ETS emissions and are not verified site data. No national policy items have been mapped yet, so scenarios use a generic reduction path.

Projected ratio · 15-year contract

Mid-sized plants

Spark-gap monitor

Portugal · today's electricity-to-gas ratio, Eurostat-based

Mid-sized plants
2.22
+0.22 gap to 2
Range, last 6 semesters (Eurostat): 1.84–2.53
Large plants
2.02
+0.02 gap to 2
Range, last 6 semesters (Eurostat): 1.94–2.60
What makes up the electricity price (mid-sized)
Volatility, last 6 semesters — same ratio, different risk

Policy forward curve

AI-extracted from national plans, laws and regulator decisions · illustrative policy items

  • No national policy items mapped for Portugal yet. Scenarios apply a generic 5 / 10 / 15% ratio reduction.
Projected ratio by scenario (mid-sized) — same levels as the map toggle